Project

Winnipeg Regional Health Authority - Crisis Stabilization Unit 755 Portage Avenue, Winnipeg


The brand new three storey 50,000 square feet building is for providing supportive services to individuals in mental health or psychosocial crisis. The mechanical designs include:

  • Direct digital control (DDC) system
  • Multi-roof top units for each area with different conditions.
  • Demand ventilation
  • Humidification system to maintain RH level within each area
  • Variable air volume (VAV) system with zone level control
  • Enhanced ventilation system to suit for Class B division 2 on the top floor
  • Wet sprinkler system throughout the entire building.
  • Plumbing system for a typical hospital application