Duck Bay Community Hall, Manitoba

The project is located in Duck Bay First Nations Reserve Land, approximately 400km north west of Winnipeg. The previous community centre was destroyed by a tragic fire and the project is to rebuild a brand new community hall on site to suit for the increase in population of the community.The community centre is used to accommodate up to 250 people ...

Jubilations Dinner Theatre, West Edmonton Mall, Edmonton Alberta

West Edmonton Mall decided to build a three storey addition to the mall complex, the third floor of the new addition is to house Jubilations Dinner Theatre with a total area of 27,000 square feet, the floor plans including dinner theatre hall up to 500 occupancy, a bar and lounge, a full scale commercial kitchen, stage and support areas, service an...

362 & 366 Wardlaw Ave. Apartment Complex

This project include two 3 storey impartment buildings with a total of 14 rental units,  The mechanical design includeA dedicated heating/cooling system for each rental unit, ceiling mounted fan coil unit with DX cooling and electrical heating, high efficiency outdoor air cooled condensing unit, HRV unit interlock with fan coil unit.separate water...

Standard Nutrition Canadian head office renovation, 627 Plinguet Street Winnipeg

The new acquired property is the former Cargill Animal Nutrition Plant,  manufacturing full line of livestock feeds for dairy, beef, swine, poultry and specialty feeds for dogs, cats, rabbits, horses, sheep and goats.The renovation is to create a total of 8,290 square feet of new head office, some challenges including: addition and renovation are...

Country Kids Learning Centre, St. Francois Xavier, MB

new daycare and after school care facility, total of 7000 square feet, including main floor and basementfully sprinklered building, including dry sprinkler system for the attic spacededicated HVAC systems for infant area, before school program area and after school program areaspecial plumbing system for daycare applicationseptic tank and low press...

Sneath Strilchuck New Funeral Building, Riverside road Dauphin MB

The project is to re-build the previous funeral home building that was destroyed by a devastating fire in 2013. the total building footprint is 12,000 square feet, including:chapel service hall and front foyer for up to 200 occupancyreception hall with kitchen for up to 200 peopleadministration offices, arrangement room, display room and support a...

Samaritan House Ministries Inc. 820 Pacific Ave. Brandon, MB

The project is to renovate an existing online store warehouse into a new facility for Samaritan House Ministries resource center, the total renovated area is over 20,000 square feet, including main floor and basement.The facility is housing Samaritan House Ministries Food Bank, which is Manitoba's second largest food bank, distributing over 14...

Preston Park II Retirement Residence

This is a six storey special personal care facility building, 118 Armistice Way Saskatoon, Saskatchewan. The mechanical design includeA make-up air system that not only pressurize the hallway, but also deliver ducted / tempered outdoor air to individual living space in each suite to enhance the ventilation.Commercial grade plumbing fixtures and plu...

Mount Carmel Mothering Center Ltd. 886 Main Street Winnipeg MB

The new mothering care facility is to provide nursery service to new born babies and provide support to new motherhood, the project includes new pre-fabricated concrete structure and renovating partial Carmel clinic with  a total of 4,000 square feetfully sprinklered buildingdedicated HVAC systems for infant area and special design for cultural ce...

Careplus Transcona Inc, Medical Clinic & Pharmacy

850 Regent Ave. Winnipeg MB.3500 square feet new walk-in clinic and pharmacy facility, new mechanical design meet the requirement of CSA Z317.2-2008....